Bedford Engineering Centre

Bedford

chevron-down

Technology Building with Electrical and Engineering workshops and associated works.

Project
overview

Sector

Education

Service

Construction

Client

Bedford College

Form of Contract

Ashe Construction

Project Manager

Project Management Solutions

Duration

48 Weeks

Architect

Bond Bryan

Completion Date

25th May 2018

Value

£5m

Project
overview

Sector

Education

Service

Construction

Client

Bedford College

Form of Contract

Ashe Construction

Project Manager

Project Management Solutions

Duration

48 Weeks

Architect

Bond Bryan

Completion Date

25th May 2018

Value

£5m

Downloads

Project PDF
arrow arrow
  • Behind the build

    John Child

    Head of Pre-Construction

    Behind the build

    John Child

    Head of Pre-Construction
  • Behind the build

    Chris Beard

    Quantity Surveyor

    Behind the build

    Chris Beard

    Quantity Surveyor
  • Behind the build

    Ian Robbins

    Managing Director

    Behind the build

    Ian Robbins

    Managing Director
  • Behind the build

    Peter Hildreth

    Site Manager

    Behind the build

    Peter Hildreth

    Site Manager
  • Behind the build

    Dan Armes

    Technical Director

    Behind the build

    Dan Armes

    Technical Director

Location

Bedford Engineering Centre
Bedford
MK42 9AH

Similar Projects